CAER 2017 Begins... Thursday 4th May!

CAER 2017 Begins... Thursday 4th May!
What will be uncovered this year?
We're back for our 11th season during which examination of trench IV will be continued. Our work will examine the interior of the masonry building (the possible chapel) with its drain discharging into the ditch, the western part of the ditch feature where it is overlain by the medieval building and the underlying deposits. This year trench IV will also be extended to the south in order to locate and examine a stone structure identified during the excavation of a service trench in 2013.
Keep up to date with all the discoveries, brought to you by our daily bloggers.

CAER Banner

CAER Banner

Follow by Email

Thursday, 2 June 2011

Tidying up the loose ends..


Jenine's story of the *almost* last day...
The end of the excavation is approaching. So, today it was less severe excavation and more trowelling and recording. To begin the day we started by recording the location of the site so that the group next year will know where to excavate. To do this a surveying instrument called a total station, which looked similar to a dumpy level as it has a tripod to hold the device, was used. The total station electronically records and measures the northings, eastings and heights of allocated points around the corners of the trench and the park by using a laser that is transmitted from the total station.
Later, trowelling continued to reveal more of the archaeology so that more detailed planning could take place.
The afternoon was spent in the finds room, which consisted of marking the finds using the foundation pens and bagging them. Double checking what exactly you have found is very important as some materials can look very similar - mortar and plaster, for example. Metal is treated differently from the other material in the bagging process as holes need to be pierced for the air to circulate so the decomposition rate isn’t increased.

No comments:

Post a Comment