A day of recording
Zoe updates us on today's activities -
Today we spent the morning working with the finds already uncovered at the beginning of the excavation. We took some of our washed and cleaned finds from the previous session, and our job was to label them with the site code and context number. This involved using Indian ink and carefully inscribing all the relevant information onto the find.
This was tricky at first, because most of us had not had the practise of working with that sort of ink before. It was sometimes tricky to work out where the information should be written, and sometimes the find was too small to fit all the information onto it!
In the afternoon, myself and the rest of the group were asked to take our turn at section drawing, which involved observing the soil at the edge of the trench, taking a measurement of each layer, and recording it down onto a piece of paper. Hopefully when all the drawings are put together they should form a sort of vertical map of the site (and no-one will be able to see where we have rubbed out mistakes!).
Comments
Post a Comment